How we work
Whole-home renovation in West Michigan, step by step
Here's how a project with us runs, stress-free and transparent from start to finish. You'll know the real numbers before we start, you won't have to chase us during the build, and we'll still be here after you move in.

Five steps from the first call to the check-ins after you move in
-
Talk it through
It starts with a short discovery call with Nate. You tell him about the house and what no longer fits, and together you find out whether we're the right fit for your plans.
-
Walk the home together
Nate comes out and walks through your house with you. We talk about your goals, your budget and your timeline, and what's possible in the space you have.
-
Plan with real numbers
We refine the layout with you, work with an architect on the drawings, make selections and set the schedule, so you know the plan before work begins and hear from us right away if a wall turns up something we didn't expect. Your proposal is built from real pricing provided by our vendors and trade partners, not a guess we hope to hold. You see the numbers before you commit.
-
Build with one point of contact
Nate runs the job and stays your one point of contact. You get onsite meetings, updates in Ressio, and a call or text from Nate when something changes, so you won't have to chase us. We protect the parts of your home that aren't under construction. If a snag turns up, you hear about it from us right away.
-
Walk through, then stay in touch
When the work is done, we walk every finished space with you. After you move in, we check in around 6 and 12 months, and we're still a phone call away after that.
How long a project takes
- A whole-home renovation, typically
- 5–7 months
A whole-home renovation typically takes 5–7 months to build
That's construction, and design and planning usually take one to two months before it, sometimes more. This kind of project touches nearly every trade in the house: framing, electrical, plumbing, mechanical and finishes. The exact length depends on your house and what we're changing, and we'll talk it through at the consultation.
- A custom home, typically
- 6–8 months
A custom home typically takes 6–8 months to build
As with a renovation, design and planning usually take one to two months before construction starts, sometimes more. New construction follows the same steps, from the first walkthrough of the site to the final walkthrough of the finished house.
- Possible with a phased build
- At home
You can stay home through a phased build
Some families stay home through the work and some move out for it. If you're staying, we plan the work in phases and protect the rooms you're still living in. Your plan lays out the schedule phase by phase before the first wall comes down.

We check in after you move in
The project doesn't end when you get the house back. Around six months after you move in, we check in to see how the house is living and take care of anything that needs attention. We check in again around 12 months.
After that, we're still a phone call away. The relationship is meant to outlast the project.
“We had multiple unintentional hiccups during our project. Anytime one would arise, Nate responded to it promptly, didn't make excuses or point fingers, he just said he would get it taken care of and corrected and he did.”
Cost-plus pricing, with real numbers from the start
You pay what the work actually costs, plus our fee
We use a cost-plus pricing model. The cost side is what our vendors and trade partners charge for the materials and the work on your house. On the 1st of each month you get an invoice with their bills and receipts attached, and our fee is added to those costs. You see every bill.
Your proposal is built from real data
Before you commit, we price the plan with the vendors and trade partners who will do the work. The numbers in your proposal come from them.
If a cost changes, you hear it from us first
Change a selection, or open a wall and find a problem, and the cost changes with it. We tell you what changed and why before it shows up on an invoice. You should never have to chase your builder for a straight answer about cost.
What we hold ourselves to
-
Keep Our Word
We do what we say we will do, when we say we will do it, and for the price we agreed upon.
-
Communicate with Honesty
We communicate clearly, proactively, and truthfully about costs, schedules, decisions, and setbacks. Even when the conversation is difficult.
-
Own the Outcome Together
We take responsibility for our work, our mistakes, and the success of the entire project, not just our individual piece of it.
“From the beginning Nate communicated with us daily on the progress of the job, what work was being done, what was coming next and how our budget was looking so there was never any surprises.”
Julie T. The Generational Farmhouse, Marne
Questions about how we work
Do we have to move out during a whole-home renovation?
It depends on the house and the scope. Some families stay home while we work in phases, and some move out for the heaviest stretch. We'll talk it through when we walk the house with you.
How long will it take?
Construction on a whole-home renovation typically takes 5–7 months, and on a custom home 6–8 months. Design and planning usually take one to two months before that, sometimes more. Your plan sets out the schedule phase by phase before work begins.
How do I know the budget won't creep?
Your proposal is priced with our vendors and trade partners before you commit, so it starts from real numbers. With cost-plus pricing you pay the actual cost of the work plus our fee. If something changes, we tell you what and why before it's billed.
Do we see the bills?
Yes. You're invoiced on the 1st of each month, and the vendor and trade-partner bills and receipts come with the invoice. Our fee is added to those costs, so you see every bill.
Who do I call when something goes wrong?
Nate. He's your one point of contact from the first call to the final walkthrough. Renovations hit snags, and when one turns up we tell you right away and own the fix.
Do you handle the design?
Yes. Planning covers the design, drawings, selections and schedule. We work with an architect on the drawings, and on some projects with an interior designer too, as we did with Kathy Waite Design on the Saugatuck River and Lakeside kitchens.

Ready to talk through your house?
Tell us about the house and what no longer fits. Nate will follow up to set a time for a project inquiry call.